Some of the Bridgehampton students and staff participated in the geothermal system information session with the engineer, construction supervisor, and construction contractor. Our students were able to ask and learn about geothermal energy, Long Island, and New York soil & water conditions, effects of hurricane on the soil and water, mechanical engineering, career opportunities, as well as the new construction project. Please View The Sag Harbor Express Article Below:

https://sagharborexpress.com/bridgehampton-school-kicks-off-geothermal-construction-test-loop/